Policy SI 9 — Safeguarded waste sites

The verbatim text from The London Plan 2021 (Greater London Authority). Read it at the official source ↗

verbatim · captured June 2026 · version-tracked
Policy SI 9 Safeguarded waste sites A Existing waste sites should be safeguarded and retained in waste management use. B Waste facilities located in areas identified for non-waste related development should be integrated with other uses as a first principle where they deliver clear local benefits. C Waste plans should be adopted before considering the loss of waste sites. The proposed loss of an existing waste site will only be supported where appropriate compensatory capacity is made within London that must be at or above the same level of the waste hierarchy and at least meet, and should exceed, the maximum achievable throughput of the site proposed to be lost. D Development proposals that would result in the loss of existing sites for the treatment and/or disposal of hazardous waste should not be permitted unless compensatory hazardous waste site provision has been secured in accordance with this policy. E Development proposals for the relocation of waste sites within London are supported where strategic waste management outcomes are achieved. 9.9.1 London has approximately 500 waste sites , defined as land with planning permission for a waste use or a permit from the Environment Agency for a waste use. This applies to land used for any waste stream. These sites cover a wide range of waste activities and perform a valuable service to London, its people and economy. 9.9.2 Any proposed release of current waste sites or those identified for future waste management capacity should be part of a plan-led process, rather than done on an ad-hoc basis. Waste sites should only be released to other land uses where waste processing capacity is re-provided elsewhere within London, based on the maximum achievable throughput of the site proposed to be lost. When assessing the throughput of a site, the maximum throughput achieved over the last five years should be used; where this is not available potential capacity of the site should be appropriately assessed. 9.9.3 Policy SI 8 Waste capacity and net waste self-sufficiency promotes capacity increases at waste sites where appropriate to maximise their use. If such increases are implemented over the Plan period, it may be possible to justify the release of waste sites if it can be demonstrated that there is sufficient capacity available elsewhere in London at appropriate sites over the Plan period to meet apportionment and that the target of achieving net self-sufficiency is not compromised. In such cases, sites could be released for other land uses.London Plan Policy SI 9 · official source →
Apply it to your address

Does this policy bear on your project?

A Planning Policy report answers that for your exact address: the designations on your property, the policies that apply — quoted verbatim like the text above — and what decided applications nearby say about your odds.

Check your postcode — free